合約編號 HY/2020/07
青山公路(管青路至海榮路)擴闊工程
合约编号 HY/2020/07
青山公路(管青路至海荣路)扩阔工程
Contract No.:HY/2020/07
Widening of Castle Peak Road
between Kwun Tsing Road and
Hoi Wing Road
Drawing Competition
The Castle Peak Road between Kwun Tsing Road and Hoi Wing Road widening projected commenced in late 2020. The scope of the Project involves widening of about 1.9 km long Castle Peak Road from Kwun Tsing Road to Hoi Wing Road, provision of noise mitigation measures, modification of an existing footbridge near Sam Shing Estate and construction of associated lifts.
The purpose of this project is to improve the traffic conditions of this road section, provide additional traffic capacity to tie in with the development of Tuen Mun East and cope with the growth in future traffic flow on Castle Peak Road; and to enhance road safety by improving the road junctions.
In order to promote the "Widening of Castle Peak Road between Kwun Tsing Road and Hoi Wing Road" to the public and to connect with the community, our project team organized this drawing competition and invited primary school students in the district to use their creativity to draw the future Castle Peak Road. The winner of the competition will have the opportunity to be a souvenirs of " Widening of Castle Peak Road between Kwun Tsing Road and Hoi Wing Road ".